Project
green · PASS- ID
agent-project-control-tower- Name
- Agent Project Control Tower
- Repo
- conanxin/agent-project-control-tower
- Location
- local
- Category
- uncategorized
- Status
PASS- Health
green- Current phase
- ACT-6B · Second Real Project Public Export
- Last agent
- local-hermes
- Last event at
- 2026-06-11T14:42:34Z
- Event count
- 10
Latest event
Connected second real open-source project artvee-gallery to the public dashboard. public-data now contains 2 real projects / 1 agent / 12 events. export_public_data.py multi-project union export verified. Cloudflare Pages re-deployed automatically after push; all 5 target URLs return 200 with expected content.
Next actions
Timeline (grouped by phase)
10 events · 9 phasesACT-6B — Second Real Project Public Export 1
Connected second real open-source project artvee-gallery to the public dashboard. public-data now contains 2 real projects / 1 agent / 12 events. export_public_data.py multi-project union export verified. Cloudflare Pages re-deployed automatically after push; all 5 target URLs return 200 with expected content.
ACT-6 — First Real Project Public Export 2
Exported the first real project status to public-data and verified the online dashboard on the custom domain. public-data upgraded from demo 2/3/3 to real 1/1/8 (agent-project-control-tower itself). public-data is the only online data source; data/ remains gitignored and private. Commit d452b84 pushed; CF Pages re-deploy triggered.
Exported the first real project status to public-data and verified the online dashboard on the custom domain. public-data upgraded from demo 2/3/3 to real 1/1/7 (agent-project-control-tower itself). public-data is the only online data source; data/ remains gitignored and private. self-bootstrap guarded by deleting ACT-6 event from data/ before final --replace export. Commit 15c98bf pushed; CF Pages re-deploy triggered; custom domain control-tower.conanxin.com will refresh within 30s. Next: ACT-6B (add a second real project) or ACT-5C (analytics / RSS).
ACT-5B — Custom Domain Verification 1
Verified custom domain for the online Cloudflare Pages dashboard while keeping public-data as the only publish data source. Custom domain control-tower.conanxin.com bound and active; 7/7 URL HTTP 200; 2/3/3 entity visible; sensitive scan 0 hits; pages.dev fallback continues to serve the same dist. Real data/ remains private.
ACT-5 — Cloudflare Pages Online Verification 1
Verified first online Cloudflare Pages dashboard using public-data as the publish data source. 7/7 URL HTTP 200, 2 projects / 3 agents / 3 events visible, sensitive scan 0 hits. Real data/ remains private.
ACT-3A — Astro Dashboard Shell 1
Added Astro dashboard shell with index, project detail, agent detail, and timeline pages using generated/index.json as the data source.
ACT-1 — Local Data Flow Prototype 1
Built zero-dependency data flow from events to generated index and embedded HTML dashboard.
ACT-2 — Tower CLI and Event Reporting 1
Added stdlib tower CLI with register/report/build/validate commands, redaction checks, and 53/53 passing smoke tests.
ACT-0 — Project Design and Architecture 1
Completed project vision, architecture, data model, workflow, MVP plan, and design report.
(no phase) 1
project 'agent-project-control-tower' registered: Agent Project Control Tower