Agent Project Control Tower

Astro dashboard shell · multi-agent project progress

Project

green · PASS
ID
agent-project-control-tower
Name
Agent Project Control Tower
Repo
conanxin/agent-project-control-tower
Location
local
Category
uncategorized
Status
PASS
Health
green
Current phase
ACT-6B · Second Real Project Public Export
Last agent
local-hermes
Last event at
2026-06-11T14:42:34Z
Event count
10

Latest event

PHASE_REPORT 2026-06-11T14:42:34Z · local-hermes · phase ACT-6B
Connected second real open-source project artvee-gallery to the public dashboard. public-data now contains 2 real projects / 1 agent / 12 events. export_public_data.py multi-project union export verified. Cloudflare Pages re-deployed automatically after push; all 5 target URLs return 200 with expected content.

Next actions

ACT-6C: connect a third real project, or ACT-7: agent reporting template and multi-machine playbook.

Timeline (grouped by phase)

10 events · 9 phases
ACT-6B — Second Real Project Public Export 1
PHASE 2026-06-11T14:42:34Z · agent-project-control-tower · local-hermes · ACT-6B · PASS
Connected second real open-source project artvee-gallery to the public dashboard. public-data now contains 2 real projects / 1 agent / 12 events. export_public_data.py multi-project union export verified. Cloudflare Pages re-deployed automatically after push; all 5 target URLs return 200 with expected content.
ACT-6 — First Real Project Public Export 2
PHASE 2026-06-11T14:16:58Z · agent-project-control-tower · local-hermes · ACT-6 · PASS
Exported the first real project status to public-data and verified the online dashboard on the custom domain. public-data upgraded from demo 2/3/3 to real 1/1/8 (agent-project-control-tower itself). public-data is the only online data source; data/ remains gitignored and private. Commit d452b84 pushed; CF Pages re-deploy triggered.
PHASE 2026-06-11T13:19:12Z · agent-project-control-tower · local-hermes · ACT-6 · PASS
Exported the first real project status to public-data and verified the online dashboard on the custom domain. public-data upgraded from demo 2/3/3 to real 1/1/7 (agent-project-control-tower itself). public-data is the only online data source; data/ remains gitignored and private. self-bootstrap guarded by deleting ACT-6 event from data/ before final --replace export. Commit 15c98bf pushed; CF Pages re-deploy triggered; custom domain control-tower.conanxin.com will refresh within 30s. Next: ACT-6B (add a second real project) or ACT-5C (analytics / RSS).
ACT-5B — Custom Domain Verification 1
PHASE 2026-06-11T12:42:21Z · agent-project-control-tower · local-hermes · ACT-5B · PASS
Verified custom domain for the online Cloudflare Pages dashboard while keeping public-data as the only publish data source. Custom domain control-tower.conanxin.com bound and active; 7/7 URL HTTP 200; 2/3/3 entity visible; sensitive scan 0 hits; pages.dev fallback continues to serve the same dist. Real data/ remains private.
ACT-5 — Cloudflare Pages Online Verification 1
PHASE 2026-06-11T11:43:38Z · agent-project-control-tower · local-hermes · ACT-5 · PASS
Verified first online Cloudflare Pages dashboard using public-data as the publish data source. 7/7 URL HTTP 200, 2 projects / 3 agents / 3 events visible, sensitive scan 0 hits. Real data/ remains private.
ACT-3A — Astro Dashboard Shell 1
PHASE 2026-06-11T03:37:58Z · agent-project-control-tower · local-hermes · ACT-3A · PASS
Added Astro dashboard shell with index, project detail, agent detail, and timeline pages using generated/index.json as the data source.
ACT-1 — Local Data Flow Prototype 1
PHASE 2026-06-11T03:21:00Z · agent-project-control-tower · local-hermes · ACT-1 · PASS
Built zero-dependency data flow from events to generated index and embedded HTML dashboard.
ACT-2 — Tower CLI and Event Reporting 1
PHASE 2026-06-11T03:21:00Z · agent-project-control-tower · local-hermes · ACT-2 · PASS
Added stdlib tower CLI with register/report/build/validate commands, redaction checks, and 53/53 passing smoke tests.
ACT-0 — Project Design and Architecture 1
PHASE 2026-06-11T03:20:59Z · agent-project-control-tower · local-hermes · ACT-0 · PASS
Completed project vision, architecture, data model, workflow, MVP plan, and design report.
(no phase) 1
PROJECT REG 2026-06-11T03:20:59Z · agent-project-control-tower · local-hermes · ACTIVE
project 'agent-project-control-tower' registered: Agent Project Control Tower